4.13 Thermal Equipment and Pipe Insulation of the Whole Plant
4.13.1 Fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
1 Scope:fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper.
2 Quality criteria and inspection methods are shown in Table 4.13.1.
Table 4.13.1 fiber felt and board laying of settings of membrane wall,superheater and cold ash hopper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_677.jpg?sign=1739366811-qkQRYndDoBxp0VNL7okYfkaIIPb5ri0k-0-eb7691b1b28f6f496296bdc0df21b622)
Table 4.13.1(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_678.jpg?sign=1739366811-t3jYKj49m5AUCrkQajToLL2mGP8tQ9os-0-aa944413dbdca368d0a0c2b485e4f5a6)
4.13.2 Main insulation wet masonry and outer wall trowel finish surface construction of thermal equipment.
1 Scope:construction of main insulation wet masonry and outer wall trowel finish surface of thermal equipment.
2 Quality criteria and inspection methods are shown in Table 4.13.2.
Table 4.13.2 Construction of main lnsulation wet masonry and outer wall trowel finish surface of thermal equipment
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_679.jpg?sign=1739366811-0Rpq2ifseI5imHjpCfFnE9VlmKzc7v3v-0-25e10c7a6121472cd49efd650fccf10e)
Table 4.13.2(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_680.jpg?sign=1739366811-W7bzwNCLsmFxPac0lmjeU69uCBQPrwKV-0-bf9ef3b4791f3ce28c32af6f8bdae4e7)
4.13.3 Erection of main insulation masonry of thermal equipment and outer wall metal hood.
1 Scope:erection of main insulation masonry of thermal equipment and outer wall metal hood.
2 Quality criteria and inspection methods are shown in Table 4.13.3.
Table 4.13.3 Main insulation masonry of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_681.jpg?sign=1739366811-JKmpPxyJWjT854GL1tKZMECS4TpfxFZY-0-35f6c402a918d31db350d52ba8803146)
Table 4.13.3(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_682.jpg?sign=1739366811-NaKmFdy9B5LMZIZXJWKi4meoFRaEBid2-0-9d48f29c1be3cb43a341fe80f461927f)
4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood.
1 Scope:insulation of flue gas ducts,hot air ducts and cold air ducts.
2 Quality criteria and inspection methods are shown in Table 4.13.4.
Table 4.13.4 Main insulation masonry(including air layer)of thermal equipment and erection of outer wall metal hood
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_683.jpg?sign=1739366811-vJQdWuEbKIKj0rB0HxGipCmWZvGQ3Lih-0-54b12a50eaecab9027343b9e3a44c942)
Table 4.13.4(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_684.jpg?sign=1739366811-YnouLfZjT99YhATxC7YkQ85hoy3XaP0T-0-ccf7899903d56e6edb2da4d4942186ec)
4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
1 Scope:construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces.
2 Quality criteria and inspection methods are shown in Table 4.13.5.
Table 4.13.5 Construction of main insulation wet masonry of thermal pipes and outer wall trowel finish surfaces
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_685.jpg?sign=1739366811-7suNYU07D6tqxgvD1NIdtxEgAtaLQQDC-0-3837f53c46bfd951e3cbbcfcd909441c)
Table 4.13.5(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_686.jpg?sign=1739366811-m59gAw3ArIN5tqev3cId6JQVPDSR9YeF-0-d5206ff5810d799cee09b7c98abb85a6)
4.13.6 Main insulation masonry of thermal pipes and erection of outer wall metal hoods.
1 Scope:main insulation masonry of thermal pipes and erection of outer wall metal hoods.
2 Quality criteria and inspection methods are shown in Table 4.13.6.
Table 4.13.6 Main lnsulation masonry of thermal pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_687.jpg?sign=1739366811-qzPmQRaqCBlvmEbzKaODbeakQCQJzZdv-0-6e9f331a597ff2fab93e8f89ef1b7d84)
Table 4.13.6(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_688.jpg?sign=1739366811-WNhXOkJBVR2203yGoFO50sNo1r7bqFiM-0-88906b5cb9da0e7eb89fc00df9c1ffa8)
4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods.
1 Scope:main steam pipes,feed water pipe and reheating steam pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.7.
Table 4.13.7 Main insulation masonry of thermal main feed water,main steam,reheating steam pipes and erection of outer wall metal hoods
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_689.jpg?sign=1739366811-zRTAYVhfO2mYMAJO4n7MRdmQ2MBRAgOO-0-3002101e2eefb4cb9ba8e358e2e1a2c5)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_690.jpg?sign=1739366811-bTC4MT4JqbCe3HjZQoVunk7RWWiGoMFZ-0-11f14eb897a940e701334c60c8459b42)
Table 4.13.7(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_691.jpg?sign=1739366811-bURlGa3xPKWxXbEOw7PN3U7h8yxrufR4-0-92b2979a35859a858570863dc462b6f8)
Note:a—erection of a metal cover at any creep expansion measuring point shall be only applicable for main steam pipe and reheating steam heating section.
4.13.8 Steam turbine proper spraying and insulation.
1 Scope:steam turbine proper spraying and insulation.
2 Quality criteria and inspection methods are shown in Table 4.13.8.
Table 4.13.8 Steam turbine proper spraying and insulation
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_692.jpg?sign=1739366811-6fVQPJmFobs5jH7ErNTAaeePlV8ylsAg-0-c6bb21607f67f0f543020d8e504d3f75)
Table 4.13.8(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_693.jpg?sign=1739366811-qsHnT1KQ02p13tZgWGsxLY8o4Sv4eBVq-0-4a1c737fe15b1b37b96f10dd7196e0da)
4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper.
1 Scope:aluminum silicate fiber felt pasting insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.9.
Table 4.13.9 Aluminum silicate fiber felt pasting lnsulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_694.jpg?sign=1739366811-qHilaLCwIJjCFkk469huRWoZ01mHeEpm-0-ee7311f1d22a0835aab2983da7b13e19)
4.13.10 Mineral fine fiber felt and board insulation of steam turbine proper.
1 Scope:mineral fine fiber felt and board insulation of steam turbine proper.
2 Quality criteria and inspection methods are shown in Table 4.13.10.
Table 4.13.10 Mineral fine fiber felt and board Insulation of steam turbine proper
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_695.jpg?sign=1739366811-ZvelqtcwV9FkMc0n3L2dQN1GU7kA7gbn-0-58651e7a6de3b9e2c2c63af353aef72c)
4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
1 Scope:insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface.
2 Quality criteria and inspection methods are shown in Table 4.13.11.
Table 4.13.11 Insulation mixtures priming,hard insulation board masonry and trowel finish coat construction of steam turbine proper cylinder contact surface
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_696.jpg?sign=1739366811-bnD7NQpi8eogdjfQMnv8Ux4hR5xdLKeO-0-474dc96e3e7a38238e017cc4976e2785)
Table 4.13.11(Continued)
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_697.jpg?sign=1739366811-momYr9HL2lh4JObWTYeMWuZjaLCvERlX-0-fd78c827d2b16b661b0c200374eff1a8)
4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes:
1 Scope:insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes.
2 Quality criteria and inspection methods are shown in Table 4.13.12.
Table 4.13.12 Insulation of aluminum silicate refractory fiber bands or ropes of small-diameter thermal pipes
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_698.jpg?sign=1739366811-l7qYpcZnFFicq9tL6Acnhg5GQbJE2jwf-0-afe17d1c09b7061f59e6a40e7d00295f)
4.13.13 FRP insulation sleeves of valves and flanges.
1 Scope:FRP insulation sleeves of valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.13.
Table 4.13.13 FRP insulation sleeves of valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_699.jpg?sign=1739366811-0ZcghaV35haVEvtJqLd1ySIrLuBuYBlq-0-d06c79530e4743b4bfcb74c29b84d7ca)
4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges.
1 Scope:insulation construction of metal shells of thermal equipment,pipe valves and flanges.
2 Quality criteria and inspection methods are shown in Table 4.13.14.
Table 4.13.14 Insulation construction of metal shells of thermal equipment,pipe valves and flanges
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_700.jpg?sign=1739366811-zCZ9HOJiiwjiKGMOVNgQpFayj7qOe9Jn-0-d6f4f171c6cc8534ad7a1fa615d7b438)
4.13.15 Certification of insulation material sampling and re-inspection.
1 Scope:insulation materials,insulation concrete materials and trowel finish surface materials.
2 The certification of insulation material sampling and re-inspection shall meet the requirements of Table 4.13.15.
Table 4.13.15 Certification of insulation material sampling and re-inspection
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_701.jpg?sign=1739366811-f4WMNBGHkbo5LSLfCT4ubdimXimkMYOP-0-00ba942fd462faac2f18005c2ab81ce8)
4.13.16 Measurement record of equipment and pipe surface temperature after insulation.
1 Scope:surface temperature measurement to boiler setting,furnace top setting,reheating steam pipes,main steam pipes and the feed water pipes after insulation.
2 The measurement record shall meet the requirements of Table 4.12.12.
4.13.17 Implementation inspection list of mandatory provisions.
1 Scope:implementation inspection of mandatory provisions on insulation subsection project of steam turbine equipment and pipes.
2 The implementation inspection of mandatory provisions shall meet the requirements of Table 4.13.17.
Table 4.13.17 Implementation inspection list of mandatory provisions
![img](https://epubservercos.yuewen.com/4C3AA5/18000637908217806/epubprivate/OEBPS/Images/txt004_702.jpg?sign=1739366811-rv439i1bED8ldcV4AA6QgQGjXRDDtufG-0-32eeb4382ec814c1c2170b59de0ac74e)